Incident Report: Site-96 Containment Breach
Incident Report: Site-96 Containment Breach
Blog Article
On 09/03 at approximately 16:21, a containment breach occurred at Site-96. Initial reports indicate that Object Class Euclid breached its secure chamber. Security personnel responded rapidly, and a full lockdown was initiated within Site-96. The breach resulted in multiple casualties to the research labs. Investigations are ongoing, and efforts are underway to secure the perimeter. The incident poses a potential threat to nearby civilian populations.
An emergency meeting has been scheduled for senior command to assess the situation and develop a action protocol. Further updates will be released promptly.
Record Entry: Site-96 - Observation Report
The ongoing period at Site-96 has revealed a noticeable increase in incidents. Most importantly, Dr. Jones exhibited erratic behavior during the late-night meeting.
Staff reports suggest a potential for hostility within Dr. Smith's dialogues with other staff members. A detailed investigation is mandated to determine the cause of this change.
Additional observations are advised for the forthcoming week.
Exploration Directive Alpha-96: Unknown Phenomena
Initial reports suggest the presence of a unconventional entity within an isolated sector. Subsequent readings are inconclusive, rendering a definitive categorization highly speculative. The entity's origin remains unknown. A thorough analysis has been commenced to evaluate the entity's capabilities. All personnel are to exercise caution while operating in the affected area.
- Further updates will be transmitted as they become available.
- Every individual is to remain calm.
Site-96 Security Override Request Denied
Your request for a security override pertaining to this location has been categorically declined. The nature of your interest does not meet the criteria for authorization. All furtherproceedings to circumvent more info security protocols will result in expulsion from Site-96. Please cease any additional submissions regarding this matter.
- Additional documentation is available in your assigned records section.
Directive: Site-96 Operational Procedures Revision 07
This memorandum outlines revisions to the operational procedures for Site-96. These changes are necessary due to recent incidents and are designed to enhance containment protocols and personnel safety. All staff members are required to become familiar with these revised procedures immediately. Failure to comply may result in disciplinary action.
The following changes are implemented:
- Authorization protocols for Sector Charlie have been revised.
- Containment procedures for SCP-object number have been adjusted. Personnel assigned to its monitoring should consult the updated documentation.
- Contingency procedures for Class-hazard level events have been implemented. All staff are obligated to complete mandatory drills on these new protocols.
Specific questions or concerns regarding these revisions should be forwarded to the Site Director.
Operation Acheron Update - Site Ninety Six Log
Site Ninety Six operations are proceeding as planned. Preliminary evaluation of the recent data indicates significant progress towards goals. However, a potential complication has been identified regarding component integration. Further analysis is required to determine the scope of this issue and implement an appropriate countermeasure.
- Standard revisions are currently under review and will be deployed upon clearance.
- Team training for the newly developed software is nearing completion.
A full progress update will be furnished at the next debriefing.
End of transmission.|Security protocol activated. | Log complete.
Report this page